JCM Capital intends to develop 60MW of grid-connected solar photovoltaic system at Nanjoka in Salima and and 40MW of the same at Golomoti in Ntcheu.  The PPAs for both Salima and Ntcheu systems were signed in September, 2018. JCM had a ground breaking ceremony for the Salima power plant on 3rd December 2018 – a ceremony that was presided over by His Excellency, the State President. The Salima Power Plant will be delivered in 7 months from the ground breaking, thus by June 2019. The Golomoti Plant will be delivered 4 months later, thus by October 2019.